Alert Center

Alert Center allows you to view all alerts and emergencies in your area. If there are alerts or emergencies, they will be listed below by category. To be instantly notified of alerts and emergencies subscribe to Notify Me or RSS.

City of Cocoa Communication

1 Alert
November 17, 2016 11:37 AM

Waste pick-up day changed

Waste pick-up service will be changed to Tuesday/Friday beginning on December 5, 2016 to residents within the GREEN sections on the attached map. (Approximately 1,300 residents). Those within the GREEN sections only will have their service days changed....

Read On...

Hurricane Weather Alert

0 Alerts
There are currently no alerts for this category.

Precautionary Boil Water Notice

0 Alerts
There are currently no alerts for this category.

Public Safety Alerts

0 Alerts
There are currently no alerts for this category.

Reclaim Outages

1 Alert
July 24, 2017 12:02 PM

Reclaimed Water Pressure Advisory

The reclaimed water system is currently experiencing intermittent pressure fluctuations and low pressures due to recent weather events.

The reclaimed water system is currently experiencing intermittent pressure fluctuations and low pressures due to recent weather events. The Sellers Water Reclamation Facility is discharging excess reclaimed water to storage ponds. The rate of discharge to...

Read On...

Rescission of Precautionary Boil Water Notice

0 Alerts
There are currently no alerts for this category.

Road Closures

5 Alerts
August 22, 2017

Micro-surfacing to begin 8/28 in the Carlton Terrace area

Micro-surfacing will begin in the Carlton Terrace area Monday, August 28th and is expected to be complete by Friday, September 1st, weather permitting. Flagging operations will assist with traffic in this area.

Schedule is as follows:
Day 1 - Dade Ct. from Mcleod Dr. to Balmont Dr., Mcleod Dr. from N Cocoa Blvd. to Dixie Ct., Belmont Dr. from N Cocoa Blvd. to Meridian Ave., Fairmont Dr. from N Cocoa Blvd. to Meridian Ave., Lucerne Dr. from the culdesac to...

Read On...
August 18, 2017

Milling, Paving and Striping begins Monday, August 21st

For Westminster Rd, Parpet Dr, Archer Ct, Norwood Circle, Sentry Dr, Scotland Rd, Arrowsmith Dr, Spring Circle, Stonemont Dr and Lake Dr from SR 520 to city limits.

Milling, Paving and Striping begins Monday, August 21st for Westminster Rd, Parpet Dr, Archer Ct, Norwood Circle, Sentry Dr, Scotland Rd, Arrowsmith Dr, Spring Circle, Stonemont Dr and Lake Dr from SR 520 to city limits. Work is scheduled to be complete...

Read On...
August 12, 2017

FDOT work on the corner of Range Rd. and SR520 - Aug 21st

A contractor for FDOT will be extending the box culvert on the corner of Range Rd. and SR 520 beginning August 21, 2017.

Traffic will be detoured down Burnett Rd. to Lake Dr. to bypass Range road work. Traffic will be able to go south on Range Rd. to access the Dollar General store on the corner of Range and SR 520 but not past the south end of the drive way of Dollar...

Read On...
August 10, 2017 4:49 PM

Intersection of Victor Rd. & Bonny Dr., Cocoa, Road Closure

The intersection of Victor Rd. & Bonny Dr. in Cocoa will be closed from Friday, August 11, 2017 until about Friday, August 18, 2017 to repair a gravity sewer pipe.

The intersection of Victor Rd. & Bonny Dr. in Cocoa will be closed from Friday, August 11, 2017 until about Friday, August 18, 2017 to repair a gravity sewer pipe.

Read On...
May 2, 2017 8:00 AM

SR 520 Roadway Resurface and Sidewalk Construction May 2017-Spring 2018

This project will mill and resurface existing SR 520/West King St from Tucker Lane to Aurora St. In addition, sidewalks will be constructed to improve area accessibility for pedestrians.

This project will mill and resurface existing SR 520/West King St from Tucker Lane to Aurora St. In addition, sidewalks will be constructed to improve area accessibility for pedestrians.

Other improvements include:
-Eastbound on ramp extension to...

Read On...